END-TO-END PRODUCTION

How garment manufacturing works

A controlled garment order is a sequence of approvals. Skipping specifications at the beginning creates cost, quality and delivery problems later.

01

Product brief

Tech pack, visuals, target market, quantity and delivery requirements are reviewed.

02

Technical feasibility

Construction, machinery, fabric, trims, applications and risk points are evaluated.

03

Quotation and order

Scope, MOQ, price, tolerance, payment, sample policy and lead time are confirmed.

04

Pattern and sample

Pattern, grading base and approval sample are prepared after confirmed order and deposit.

05

Material approval

Fabric, colour, trims, labels, print or embroidery are approved for bulk.

06

Fabric resting and cutting

Fabric is inspected, rested and cut using approved patterns and marker planning.

07

Applications and sewing

Print, embroidery or other pre-sewing operations are coordinated before assembly.

08

Finishing and QC

Washing, buttons, ironing, measurements, appearance and workmanship checks are completed.

09

Packing and shipment

Goods are folded, packed, carton-marked and prepared with export documentation.

PRODUCTION RFQ

Send a production-ready inquiry.

To keep technical information organized and avoid misunderstandings, quotation requests are reviewed through our contact page.

Production termsStandard MOQ: 300 pcs per style and colourNo pre-order samples for new customers50% deposit · 50% before shipment

Please include the following information:

  • Product images or reference photos
  • Professional Tech Pack, if available
  • Fabric composition and GSM, if known
  • Size range and colour options
  • Estimated quantity per style and colour
  • Logo, label and packaging requirements
  • Destination country and target date
  • Additional requirements or special requests

Our technical team reviews project feasibility and capacity before preparing a quotation.

Quotation email: info@turkeyclothingproduction.com
MENU
NAVIGATION / 8
RFQ TermsContact