Fabric sourcing · TGM KNOWLEDGE BASE

Stock Fabric vs Custom Knitting and Dyeing

Stock material improves speed; custom material improves control but raises minimums.

What brands need to know

Stock fabric can reduce lead time and minimums, but shade, available quantity, lot consistency and repeatability must be confirmed. Custom production allows composition, yarn, construction, weight, width, colour and finish to be developed around the product. Special knitted or dyed fabric commonly requires around 200 kg per colour in TGM programs and adds production time. The correct route depends on garment quantity, target price, repeat-order plan and how unique the fabric must be.

Production checklist

  • Verify stock lot quantity
  • Plan repeat-order continuity
  • Compare garment yield per kilogram
  • Add custom fabric lead time

How this affects your quotation

A reliable quotation depends on the final design, construction, fabric, GSM, colours, size range, quantity per style and colour, branding, packing, delivery country and target date. Commercial feasibility and material availability are reviewed before a price is confirmed.

Do you have a production-ready project?

Review the RFQ requirements

PRODUCTION RFQ

Send a production-ready inquiry.

To keep technical information organized and avoid misunderstandings, quotation requests are reviewed through our contact page.

Production termsStandard MOQ: 300 pcs per style and colourNo pre-order samples for new customers50% deposit · 50% before shipment

Please include the following information:

  • Product images or reference photos
  • Professional Tech Pack, if available
  • Fabric composition and GSM, if known
  • Size range and colour options
  • Estimated quantity per style and colour
  • Logo, label and packaging requirements
  • Destination country and target date
  • Additional requirements or special requests

Our technical team reviews project feasibility and capacity before preparing a quotation.

Quotation email: info@turkeyclothingproduction.com
MENU
NAVIGATION / 8
RFQ TermsContact